Based in Burnley, Lancashire · Fabrication for the North West & further afield
HomeServicesMIG Welding
Fabrication capability

MIG Welding & Mild-Steel Fabrication

Practical MIG welding for mild-steel frames, sections and fabricated assemblies — an important secondary capability alongside Zeus's stainless steel and TIG specialism.

Fabricated hopper and support frame

What MIG welding is used for

MIG welding feeds a continuous wire electrode through the welding torch while shielding gas protects the weld pool. It is a versatile production process and is widely used for fabricated metalwork, frames, brackets and assemblies where efficient welding and repeatable joints are important.

Whether MIG is the right choice depends on the material, joint design, section size, access and specification. If you are buying a finished fabrication rather than a welding-only service, the simplest approach is to send the complete drawing and let the welding process be considered alongside the rest of the job.

From cut parts to welded assembly

A MIG-welded fabrication may begin with laser-cut profiles, folded sheet or prepared sections. Those parts then need to be positioned, joined and checked as an assembly. Where the job includes brackets, frames, hoppers, supports or other formed components, showing the full assembly on the enquiry is far more useful than sending each piece separately.

If important dimensions must be held after welding, identify them clearly on the drawing. Welding introduces heat, so critical interfaces and mating dimensions need to be understood as part of the fabrication requirement.

Typical information for a MIG welding enquiry

  • Overall fabrication drawing or sketch
  • Material and section sizes if known
  • Thicknesses
  • Quantity
  • Weld symbols or joint details where specified
  • Critical dimensions or interfaces
  • Required coating, finish or final treatment
  • Delivery postcode and timescale

If you only have an existing fabrication to copy or alter, photographs and measurements can start the enquiry. Include close-ups of joints and any areas where the new item must fit another component.

Welding is only one part of the finished job

Customers usually need a usable component, not simply metres of weld. Zeus can quote the associated cutting, bending, fabrication and finishing where they form part of the same requirement. That keeps the quotation focused on what has to be delivered.

See genuine Zeus fabrication

The photographs below show work fabricated by Zeus. They give a practical indication of the type, finish and scale of work customers can discuss when sending a new enquiry.

Frequently asked questions

When is MIG welding used instead of TIG?

MIG is often chosen where efficient welding of fabricated assemblies is important, while TIG is often selected where fine control or appearance is a stronger consideration. The drawing, material and joint determine the best route.

Can Zeus quote a complete welded frame or assembly?

Yes. Send the complete drawing, section sizes, quantity and finish requirement so the fabricated assembly can be considered as one job.

Do I need to specify the welding process on my drawing?

Not always. If the process is not a design requirement, describe the finished component and any performance or appearance requirements. The fabrication can then be reviewed against the job.

Send the job for a quote

Send your drawing, quantity, material if known, finish requirement and delivery postcode. If you do not have a drawing, attach photographs and describe what you need the component to do.

Send us your drawing